Demolition & Abatement of 12.
The decommissioning of the former Bostik Smart Adhesives factory . The demolition consisted of dismantling.
Demolition & Abatement of 4 story 64,000 sft concrete framed.
Demolition & abatement of 15,000 SFT of structures and 60,000 SFT of hardscapes . The project consisted of the.
The selective demolition of 1013 guestrooms at the Anaheim Marriott. UEI was tasked with completing the demolition of.
Demolition & Abatement of eight 6000 sft flat top barracks at Marine Corps Base Camp.
The abatement and selective demolition of a 25 story tower and adjacent 8 story annex building. The project consisted.
Demolition of the former CCUSD Natatorium building between Culver City Middle School and Farragut Elementary School.
The Demolition of 4443 SFT home located on a hillside in Rancho Palos.
The Demolition of nine 650,000 gallon jet fuel.
The Asbestos, lead & hazardous materials abatement & selective demolition of 10,000 sft Microchip manufacturing.
Asbestos abatement of 2 large industrial canning machines within an operating food processing and canning facility..
Previously being Fort Ord and used as military training facility since 1917, was the largest facility to be dissolved.
The remediation and demolition of the former Sunkist Orange Processing Facility. The remediation consisted of over 1.
The abatement and demolition of two buildings on the corner of Hollywood & Vine. The demolition was carefully planned.
The interior demolition and abatement of a grocery store in Norwalk, CA. The project consisted of demolishing all.
The abatement and demolition of the original three-story engineering building at UCLA. The project consisted of the.
The abatement and demolition of the world famous Friars club. The entire building was enclosed with shrink wrap to.
The demolition and abatement of the former Boyce Library at Goldenwest Community College. This project was funded by.
The abatement and demolition of the Watts public housing neighborhood, Jordan Downs. The project is part of the Housing.
The abatement and demolition of Pacific Palisades Village. The project consisted of the demolition of five commercial.
Select interior and exterior demolition, decontamination, and abatement of the Microsemi manufacturing warehouse.
The former La Paloma Winery site is more than 100 years old and has been out of operation for decades. The total.
The abatement of lead and asbestos at Mt. San Antonio College’s Athletic Stadium. The project consisted of the.
Previously being Fort Ord and used as military training facility since 1917, was the largest facility to be dissolved.
Unlimited has performed over 40 jobs for St. Mary’s Medical Center and maintains an open contract agreement for.
The demolition of the historic Miramar Hotel in Montecito, CA. The hotel was established in the late 1880s and was the.
The structural demolition of a three story, 35,000 sf concrete building utilizing a wrecking ball. The scope also.
The demolition of a 7,000 sf ft building and tank over 180 feet in the air. The project also included abatement of.